120th Avenue and NE 85th Street Water System Improvements 3

120th Avenue and NE 85th Street Water System Improvements

Kirkland, WA

Water Utility Engineering

KPG provided survey, design and construction management services for two recent City of Kirkland projects, located along 120th Avenue NE and NE 85th Street. The projects included design and installation of 5,000 feet of 24 inch transmission main and appurtenances.  It also included more than 1,400 LF of new ductile iron 12 to 20 inch water distribution mains, along with new hydrants, services, and connections to lateral mains. Other improvements within the corridor included roadway, pedestrian, stormwater, landscaping and illumination.